Home Inspection Intake Forms: What Every Inspector Needs to Document Before Walking the Property
After two thousand inspections, I can tell you exactly where most home inspection businesses lose money: before they ever set foot on the property. Not during the inspection itself, and not in the report-writing phase. The loss happens at intake, when a phone call or online booking captures a name, an address, and a date — and nothing else.
That "nothing else" is how you end up driving forty-five minutes to a 6,000-square-foot colonial with a pool, a detached workshop, a well, and a septic system, only to discover the client expected a $350 flat-rate inspection that covers everything. It is how you arrive at a 1920s bungalow to find knob-and-tube wiring running through blown-in insulation in the attic — a fire hazard you now have to document — when the listing agent told you the electrical had been "updated." It is how you show up for what you thought was a standard buyer inspection and discover the client is actually a real estate investor who wants you to scope a commercial mixed-use building with a flat roof, a boiler system, and three tenant units.
A proper home inspection intake form captures the property, the people, the scope, the exclusions, the ancillary services, the legal protections, and the logistics before you load your ladder onto the truck. Here is what each section needs to include and why it matters for every inspection type you will encounter.
Property identification and access instructions
The property section of your intake form is not a formality. It drives your pricing, your time estimate, your equipment selection, and your report template. An inspector who shows up to a 4,500-square-foot home expecting an 1,800-square-foot ranch has already blown the schedule for the rest of the day.
- Full property address with unit number — seems obvious, but incomplete addresses are remarkably common. Condos, townhomes, and multi-family properties need the unit number. Rural properties may need a lot number or parcel ID in addition to the mailing address. Properties in new developments may not have a mailing address yet — capture the lot number and subdivision name.
- Property type — single-family detached, townhome, condo, duplex, triplex, fourplex, manufactured or modular home, log home, historic property, or commercial. Each type has different inspection standards, different systems to evaluate, and different pricing. A condo inspection in a high-rise does not include the roof, the exterior cladding above the unit, or the common-area mechanical systems. A manufactured home has its own HUD standards that differ from the IRC residential code.
- Approximate square footage and number of stories — this determines your time on site. Budget ninety minutes for a 1,200-square-foot ranch. Budget three to four hours for a 4,000-square-foot two-story with a finished basement. Square footage also determines your fee tier if you use a graduated pricing model, which most inspectors do.
- Year built — this single data point tells an experienced inspector more about the property than anything else on the form. A home built in 1955 probably has a fuse box, possibly knob-and-tube wiring, galvanized steel drain lines, and cast iron waste stacks. A home built in 1985 might have polybutylene supply piping — the gray plastic pipe that is the subject of a class-action settlement and that most insurance companies will not cover. A home built in 2006 during the construction boom might have Chinese drywall, rushed framing, or an FPE Stab-Lok electrical panel that was recalled because its breakers fail to trip under overload. Year built is not trivia — it is a diagnostic tool.
- Lot size and outbuildings — a quarter-acre suburban lot with a one-car detached garage is a different scope than a five-acre rural property with a barn, a workshop, a pool house, and a guest cottage. Each outbuilding is either included in the inspection scope (at additional cost) or explicitly excluded. You need to know what is on the property before you quote.
- Access instructions — lockbox code, gate code, alarm system disarming instructions, who will be present to provide access, any dogs that need to be secured, keys for detached structures. Arriving on-site without access wastes an hour of your day and the client's money. If the property is vacant, confirm who authorized you to enter and document it. If tenants occupy the property, confirm that they have been notified and will provide access to all rooms.
- Utilities status — are water, gas, and electricity turned on? You cannot test the HVAC system without power. You cannot test the water heater, plumbing fixtures, or dishwasher without water. You cannot evaluate the furnace or gas range without gas service. If utilities are off, the client needs to understand that those systems will be excluded from the inspection and may require a re-inspection at additional cost once utilities are restored. Vacant and foreclosed properties are the most common offenders — winterized homes with drained plumbing and disconnected gas are the norm, not the exception.
Client information and agent roles
A home inspection involves more parties than most service engagements. The client who pays for the inspection may be the buyer, the seller, a real estate agent ordering on behalf of a buyer, a relocation company, a property management firm, an estate executor, or a bank. Each scenario changes who receives the report, who can rely on the findings, and who your contractual relationship is with.
- Client name, phone, and email — the person who is hiring and paying for the inspection. This may not be the person who will attend the inspection or the person whose name is on the purchase contract.
- Company (if applicable) — relocation companies, property management firms, investor groups, real estate brokerages ordering inspections on behalf of clients, banks ordering pre-foreclosure assessments. The company name goes on the invoice and the pre-inspection agreement.
- Client role — buyer, seller, homeowner (not selling), real estate investor, property manager, estate representative, insurance company, lender. This determines the inspection type, the report format, and the Standards of Practice that apply.
- Buyer's agent name, brokerage, phone, and email — in a standard buyer inspection, the buyer's agent is your primary point of contact for scheduling, access, and report delivery. Many inspectors deliver the report to both the client and the buyer's agent simultaneously.
- Listing agent name, brokerage, phone, and email — the listing agent controls property access, holds the lockbox code, and coordinates with the seller for access to tenant-occupied units. In a pre-listing inspection, the listing agent is often the one ordering the inspection on behalf of the seller.
- Who will attend the inspection — the buyer, the buyer's agent, both, the seller (rare and generally discouraged), a family member, or nobody. Attendance affects the walkthrough portion of the inspection — a client who attends gets a live explanation of findings that a remote client does not. Some inspectors charge a re-inspection fee if the client wants a separate walkthrough after receiving the report.
Scope of inspection and exclusions documentation
Scope is where inspectors get sued. Not because they missed something during the inspection, but because the client believed the inspection covered something it did not. A standard home inspection per ASHI (American Society of Home Inspectors) or InterNACHI (International Association of Certified Home Inspectors) Standards of Practice is a visual, non-invasive evaluation of readily accessible systems and components. It is not a code inspection, not an engineering analysis, not a mold test, not a pest inspection, and not a guarantee that nothing will break after closing.
Your intake form must establish the scope clearly and document what is excluded:
- Standard inspection scope — structural components, exterior cladding and trim, roofing and flashings, plumbing supply and drain systems, electrical service and distribution, heating system, cooling system, insulation and ventilation, interior surfaces, windows and doors, foundation and crawlspace, attic framing and sheathing, garage and garage door. This is the baseline that every state's Standards of Practice requires.
- Exclusions by standard — items not visible or accessible, items concealed behind walls, ceilings, or floors, underground utilities, cosmetic conditions, code compliance verification, engineering analysis, environmental hazards (radon, mold, asbestos, lead) unless separately contracted, pest and termite inspection (separate service in most states), pool and spa equipment, well and septic systems, low-voltage systems (alarm, intercom, central vacuum, speaker wiring), solar panel systems, irrigation systems, outbuildings not included in scope.
- Client-initiated scope modifications — sometimes the client wants a limited inspection. An investor buying a rental property for demolition and rebuild may only want structural and environmental. A buyer purchasing a condo may not need exterior or roof inspection. Your intake should allow the client to request a reduced scope and document that the reduction was client-initiated, not inspector-initiated. Reduced scope also means reduced liability — you cannot be held responsible for systems the client specifically excluded.
- Scope expansion acknowledgments — conversely, some clients want more than a standard inspection. They want you to inspect the pool, test the well water, scope the sewer line, test for radon, sample for mold, and inspect the detached barn. Each add-on has its own pricing, its own time requirement, and its own liability exposure. Your intake form should list available add-ons, their pricing, and require acknowledgment that items not selected are excluded.
Pre-inspection agreement and limitation of liability
The pre-inspection agreement is the most important legal document in your business. It is the contract between you and the client that defines the scope of the inspection, your standard of care, the limitation of your liability, the dispute resolution mechanism, and the conditions under which the client can bring a claim. Every state has different rules about what an inspector can and cannot limit, and your agreement must comply with your state's statute.
- Limitation of liability clause — most states allow home inspectors to limit their liability to the fee paid for the inspection. Some states (such as Illinois and New Jersey) have specific statutes governing what limitations are enforceable. Texas requires inspectors to use a state-promulgated pre-inspection agreement. Your intake should include the limitation clause and require the client's signature or initials specifically on that clause — not just at the bottom of the document.
- Standard of care — your agreement should specify that the inspection is performed in accordance with your state's Standards of Practice and the standards of your professional association (ASHI, InterNACHI, or state-specific). This establishes the benchmark against which your performance will be judged if a claim is filed.
- Conditions not inspected — concealed conditions, inaccessible areas, systems that cannot be operated, and areas excluded at the client's request. Document every area you could not access: the attic hatch blocked by furniture, the crawlspace entry obstructed by stored items, the electrical panel covered by a finished wall, the roof too steep or wet to walk safely. What you cannot see, you cannot report on — and if it is documented in the agreement, you cannot be held liable for it.
- Dispute resolution — mediation before arbitration, arbitration before litigation, or direct litigation. Most inspector agreements include mandatory mediation and/or binding arbitration clauses. Some states restrict the enforceability of mandatory arbitration in consumer contracts. Your intake should specify the dispute resolution process and the governing jurisdiction.
- Claim notification period — many inspector agreements require the client to notify the inspector within a specified period (often one year) after the inspection before commencing a claim. Some states limit or prohibit shortened statutes of limitation in consumer contracts. Document the notification requirement in the intake agreement and require the client's acknowledgment.
Structural, electrical, plumbing, HVAC, and roof inspection checklists
Your intake form should include a checklist section for each major system so the inspector can pre-populate known conditions and flag items for special attention. This is not the inspection report — it is the pre-inspection intelligence that makes the on-site inspection more thorough and more efficient.
- Structural — foundation type (poured concrete, block, stone, pier and beam, slab-on-grade), known cracks or settling, previous foundation repairs, additions that may have a different foundation type than the original structure, evidence of water intrusion in the basement or crawlspace, grade and drainage around the foundation. A home with a stone foundation built in 1890 requires a fundamentally different structural evaluation than a home built on a poured slab in 2015.
- Electrical — service amperage (60, 100, 150, 200, 400 amp), panel manufacturer and type (and specifically whether it is a Federal Pacific Stab-Lok, Zinsco, Pushmatic, or other recalled panel), known wiring types (copper, aluminum, knob-and-tube), GFCI protection in wet locations, AFCI protection in bedrooms (required since 2002 NEC), subpanel locations, known electrical issues. The panel brand alone can be a deal-killer — FPE Stab-Lok panels have a well-documented failure rate and many insurance companies will not write a policy on a home with one installed.
- Plumbing — supply pipe material (copper, PEX, CPVC, galvanized steel, polybutylene), drain pipe material (PVC, ABS, cast iron, galvanized, orangeburg), water heater type and age, water heater fuel source (gas, electric, tankless, heat pump), known leaks or water damage, water pressure issues, sewer type (municipal, septic, cesspool), well water if applicable. Polybutylene supply piping (gray plastic, common in homes built between 1978 and 1995) is a known defect that triggers remediation recommendations and may affect insurability.
- HVAC — heating system type (forced air, boiler/radiator, heat pump, baseboard electric, geothermal), cooling system type (central air, ductless mini-split, evaporative cooler, none), fuel source (natural gas, propane, oil, electric), system age, last service date, ductwork type and condition, thermostat type, zoning. A steam boiler in a 1940s colonial operates on entirely different principles than a high-efficiency condensing furnace in a 2020 new-build. Your inspector needs to know what they are walking into so they bring the right diagnostic tools.
- Roof — roofing material (asphalt shingle, architectural shingle, metal, tile, slate, flat/membrane, wood shake), roof age, number of layers, known leaks or repairs, flashings and penetrations, gutter and downspout condition, ice dam history in cold climates. A three-tab asphalt shingle roof installed in 2005 is at the end of its expected service life. A slate roof installed in 1920 may have another fifty years. The material and age determine the inspection approach, the expected findings, and the recommendations.
Radon, mold, asbestos, and lead paint testing consent
Environmental testing is not part of a standard home inspection. Each test is a separate service with its own pricing, its own methodology, its own reporting requirements, and its own liability exposure. Your intake form should present each test as an opt-in add-on with a clear description of what the test does, what it costs, and what the client should expect.
- Radon testing — radon is a naturally occurring radioactive gas that enters homes through the foundation. It is the second leading cause of lung cancer after smoking. The EPA recommends testing every home below the third floor, and the action level is 4.0 pCi/L. Most inspectors use continuous radon monitors (CRMs) that are placed in the lowest livable area for a minimum of 48 hours. Your intake should document the test location, the placement date and time, and the closed-house conditions required during the test period. If the client selects radon testing, you may need to place the monitor one to two days before the inspection and retrieve it the day of — which means two trips to the property. Price accordingly.
- Mold assessment — a home inspection is not a mold inspection, and most state licensing laws prohibit home inspectors from performing mold remediation. What inspectors can do varies by state — some states allow inspectors to take air samples and surface samples as an ancillary service, while others require a separate mold assessor license. Your intake should specify whether you offer mold sampling, what type of sampling (air, surface, bulk), which lab processes the samples, and the turnaround time for results. If you do not offer mold services, your intake should explicitly state that mold assessment is excluded and recommend a qualified mold assessor if conditions warrant.
- Asbestos awareness — home inspectors do not test for asbestos. Asbestos identification requires laboratory analysis of material samples, and asbestos abatement is a licensed specialty. However, your intake should note the property's age and flag the potential for asbestos-containing materials in homes built before 1980 — vinyl floor tiles, pipe insulation, vermiculite attic insulation (Zonolite), popcorn ceilings, and transite siding are the most common. Your intake can recommend asbestos testing by a qualified professional if the inspection reveals suspect materials that will be disturbed during renovation.
- Lead paint disclosure — federal law requires sellers of homes built before 1978 to disclose known lead-based paint hazards and provide the EPA pamphlet "Protect Your Family from Lead in Your Home." Your intake should document the property's construction date and whether the lead paint disclosure was provided. If the client wants lead paint testing, this is a separate service requiring XRF (X-ray fluorescence) analysis or paint chip sampling — equipment and certifications most home inspectors do not carry. Document the referral to a certified lead inspector if requested.
Pool, spa, and outbuilding inspection add-ons
Ancillary inspections are where experienced inspectors differentiate their business and increase their average ticket. Each add-on has its own scope, its own pricing, and its own time requirement. Your intake form should present these as clearly priced options that the client selects or declines:
- Pool and spa inspection — pool shell condition (plaster, vinyl liner, fiberglass), decking condition and safety compliance, fencing and barrier compliance with local code, pump and filter system, heater, chlorinator or salt system, safety covers, anti-entrapment drain covers (Virginia Graeme Baker Act compliance), diving board and slide condition, water chemistry (if testing is offered). A pool inspection adds thirty to sixty minutes and typically commands a $100 to $200 add-on fee. Your intake should document whether the pool is open and operational or winterized and covered — a winterized pool cannot be fully evaluated.
- Spa and hot tub — structural condition, jets and plumbing, electrical (GFCI protection is mandatory, and the disconnect must be within sight of the spa but not reachable from the water), cover condition, heater and controls. Portable spas are personal property and technically not part of the real estate transaction, but clients frequently ask inspectors to evaluate them.
- Detached garage and workshop — structural condition, electrical service (separate panel or subpanel fed from the house), GFCI and lighting, overhead door and opener, fire separation if the garage shares a wall with the living space, floor condition, roof condition. A detached garage with its own 100-amp subpanel, a car lift, and a woodworking shop is a significant inspection scope addition.
- Barn, guest house, or accessory dwelling unit (ADU) — each additional occupied or occupiable structure is effectively a separate inspection. An ADU with its own kitchen, bathroom, electrical panel, and HVAC system requires a full systems evaluation. Your intake should price each additional structure separately and document whether the structure is legal (permitted and compliant with zoning) or unpermitted.
Sewer scope and well water testing documentation
Sewer and water are the two ancillary services that most directly affect the transaction. A failed sewer line can cost $10,000 to $30,000 to replace. A contaminated well can cost $5,000 to $15,000 to remediate. These are deal-killers, and buyers increasingly expect them to be part of the inspection process.
- Sewer scope — a video camera inspection of the main sewer lateral from the house to the municipal connection or septic tank. This reveals root intrusion, bellied sections, offsets at joints, cracked or collapsed pipe, orangeburg pipe (a compressed wood-fiber pipe used from the 1940s through the 1970s that deteriorates over time), and back-pitched sections that hold standing water. Your intake should document whether the client has requested a sewer scope, whether an exterior cleanout is available (required for camera access without pulling a toilet), and whether the property connects to municipal sewer or a private septic system. If you subcontract sewer scoping to a plumber, your intake should identify the subcontractor and clarify that the sewer scope report is issued under the plumber's license, not yours.
- Septic system evaluation — if the property has a septic system, a standard home inspection notes the system type and condition of visible components, but a full septic evaluation requires locating and opening the tank, measuring the sludge and scum layers, checking the distribution box, and evaluating the drain field. In most states, this requires a separate licensed septic evaluator. Your intake should clarify whether a septic evaluation is included, referred to a specialist, or excluded entirely — and document the last pump-out date and any known system history.
- Well water testing — properties with private wells require water quality testing that a municipal water supply does not. Standard well water tests include bacteria (total coliform and E. coli), nitrates, pH, hardness, iron, manganese, turbidity, and sometimes volatile organic compounds (VOCs) or heavy metals depending on the region. FHA and VA loans require well water testing as a condition of financing. Your intake should document whether the property has a well, whether the client wants water testing, which tests are requested, and which lab will process the samples. Well water testing requires a specific collection protocol — running the water before sampling, using sterile containers, maintaining chain of custody, and delivering samples to the lab within the hold time (typically 24 to 48 hours for bacteria).
Pre-listing vs. buyer inspection: different clients, different documentation
The same house inspected by the same inspector produces a fundamentally different intake process depending on who ordered the inspection and why. Your intake form needs to accommodate both scenarios and capture the information specific to each.
- Buyer inspection — the most common type. The buyer (or buyer's agent) orders the inspection during the due-diligence period, typically within five to fifteen days of the accepted purchase offer. The intake should capture the contract contingency deadline (the date by which the inspection must be completed and objections raised), the buyer's agent's contact information for scheduling and report delivery, and whether the buyer wants to attend the inspection. Time pressure is real — missing the contingency deadline can mean the buyer waives the inspection contingency or loses the deal. Your scheduling process must account for this.
- Pre-listing (seller) inspection — the seller orders the inspection before listing the property, typically to identify and repair issues before buyers find them. The intake is different: there is no buyer's agent, no contingency deadline, and the seller is usually present and available to provide access and history. The seller wants the inspection to be thorough so they can address problems proactively. Your intake should capture the seller's timeline for listing, their budget for repairs, and whether they want the report to include repair cost estimates (which standard inspection reports do not typically include). Note: some states require that a pre-listing inspection report be disclosed to prospective buyers once it exists. Your intake should address this disclosure obligation.
- Relocation inspection — a relocation company orders the inspection on behalf of an employee being transferred. The intake involves a corporate client, a relocation coordinator, and sometimes a third-party inspection management company. Payment terms, report format requirements, and delivery timelines are often dictated by the relocation company's contract with the employer. Your intake should capture the relocation company's requirements and any proprietary report formats they require.
New construction and 11-month warranty inspections
New construction inspections are not simpler than existing-home inspections — they are different. The assumption that a new home has no problems is the reason clients hire inspectors for new construction in the first place. Builders make mistakes, subcontractors cut corners, and municipal inspectors are overloaded and miss things.
- Phase inspections during construction — some clients hire inspectors to perform phase inspections at key milestones: pre-pour (foundation forms and rebar), pre-drywall (framing, rough plumbing, rough electrical, HVAC ductwork, insulation), and final (completed home before closing). Each phase inspection is a separate engagement with its own scope. Your intake should document which phases the client has selected, the builder's construction schedule, and the process for coordinating access with the job superintendent. Pre-drywall is the most valuable phase because it is the last opportunity to see the framing, wiring, plumbing, and ductwork before it is concealed behind walls.
- Final walkthrough inspection — performed after the certificate of occupancy is issued and before the buyer closes. This is a full standard inspection with the additional expectation that everything should be new and functioning properly. Punch-list items — scratched countertops, missing outlet covers, windows that do not lock, HVAC registers not connected to ductwork, reversed hot and cold plumbing — are documented for the builder to address before closing. Your intake should note the closing date and the builder's punch-list process.
- 11-month warranty inspection — most builders provide a one-year warranty on workmanship. At the eleven-month mark, the homeowner hires an inspector to identify all warranty items before the coverage expires. Your intake should document the warranty start date (usually the closing date), the warranty expiration date, and any items the homeowner has already reported to the builder. The 11-month inspection is a thorough re-evaluation of the entire home with a specific focus on items that develop over the first year: foundation settling cracks, nail pops in drywall, grout cracking in tile, HVAC system performance after a full heating and cooling season, and drainage patterns around the foundation that may not have been apparent when landscaping was first installed.
Commercial property inspection intake
Commercial property inspection is a different discipline from residential, governed by different standards (ASTM E2018 for commercial building inspections), different pricing models (typically based on square footage and building type), and different client expectations. If your business handles commercial inspections, your intake form needs a commercial section or a separate commercial intake entirely.
- Building type and use — office, retail, industrial, warehouse, mixed-use, multifamily (five or more units), restaurant, medical, religious, educational. Each building type has different systems, different code requirements, and different inspection priorities. A restaurant inspection includes the commercial kitchen exhaust hood and fire suppression system. A warehouse inspection includes the loading dock, overhead doors, and clear-height measurements. A multifamily inspection includes common areas, mechanical rooms, and a representative sample of individual units.
- Number of units or tenant spaces — in a multifamily or mixed-use building, the number of units determines the inspection scope and pricing. ASTM E2018 does not require inspection of every unit — it recommends a representative sample. Your intake should document the total unit count, any units with known issues, and any units where tenant access may be restricted.
- Roof type and access — commercial buildings overwhelmingly have flat or low-slope roofs with membrane systems (TPO, EPDM, modified bitumen, built-up roofing). These require different evaluation criteria than residential roofs. Your intake should document the roof type, the last time it was replaced or re-coated, and whether roof access is available via an interior hatch, an exterior ladder, or requires your own extension ladder.
- Fire and life safety systems — commercial buildings have fire alarm systems, sprinkler systems, fire extinguishers, emergency lighting, and exit signage that residential properties do not. These systems require specialized knowledge and, in many jurisdictions, separate licensed fire protection inspectors. Your intake should document what fire and life safety systems are present and whether the client wants them included in the inspection scope or evaluated by a separate specialist.
- ADA compliance — commercial properties are subject to the Americans with Disabilities Act, which governs accessible parking, ramps, doorway widths, restroom configurations, and signage. ADA compliance is not part of a standard building inspection, but it is a common client concern in commercial transactions. Your intake should clarify whether ADA is in scope or excluded.
State licensing requirements and Standards of Practice
Home inspector licensing varies dramatically by state. Some states have rigorous licensing requirements with mandatory education, supervised field experience, continuing education, and state examinations. Others have no licensing requirement at all. Your intake form should document your credentials and comply with your state's specific requirements.
- Inspector license number and expiration — in licensed states, your license number must appear on the inspection report and typically on the pre-inspection agreement. Your intake form should include your license number, your state, and confirm that your license is current. In states that require E&O (errors and omissions) insurance, include your policy number and coverage amount.
- Standards of Practice disclosure — most licensed states require inspectors to perform inspections in accordance with a specified standard — either the state's own SOP or a recognized national standard (ASHI or InterNACHI). Your intake should identify which standard governs the inspection and provide the client with access to the standard (many states require a copy or a link to be provided before the inspection).
- State-specific disclosures — some states require specific disclosures at intake. Texas requires the use of a promulgated pre-inspection agreement. Illinois requires specific limitation-of-liability language. New Jersey requires disclosure of the inspector's relationship to any repair contractors. California requires specific language about the scope limitations of a visual inspection. Your intake form must include whatever disclosures your state mandates — and be updated when the regulations change.
Report delivery preferences and timeline
Report delivery is a service component that clients care about more than most inspectors realize. A buyer under a five-day inspection contingency does not want to wait three days for the report. A listing agent who ordered a pre-listing inspection needs the report before the listing goes live.
- Report format — digital (PDF, HTML-based web report, or proprietary software format), printed hard copy, or both. Most modern inspection businesses deliver digital reports via email or a secure link. Some clients, particularly attorneys and relocation companies, require printed copies. Your intake should capture the preferred format and the email addresses for delivery.
- Delivery timeline — same-day, 24 hours, 48 hours, or end of business on a specified date. Many inspectors promise 24-hour delivery as a competitive differentiator. If you deliver same-day reports, your intake should set that expectation. If your turnaround is 48 hours, document it — and do not promise faster delivery than you can reliably provide.
- Report recipients — client only, client and buyer's agent, client and listing agent, client and attorney, or a distribution list provided by the client. Your pre-inspection agreement should specify who the report can be shared with and whether sharing it with third parties extends your liability to those third parties (most agreements expressly limit reliance to the named client).
- Summary report — some clients want a summary of major findings in addition to the full report. Listing agents often want a one-page summary they can share with potential buyers. Attorneys want a summary they can attach to repair requests. Your intake should capture whether a summary is requested and, if so, the format and recipient.
Payment terms and cancellation policies
Home inspection is one of the few professional services where payment is expected at the time of service, before the deliverable (the report) is produced. Your intake form should establish payment expectations clearly:
- Inspection fee — the base fee for the standard inspection, broken out from any ancillary service add-ons. Transparency in pricing builds trust and prevents the "I did not know it would cost that much" conversation at the end of the inspection.
- Ancillary service fees — each add-on service (radon, sewer scope, pool, well water, mold sampling, outbuilding) itemized separately. The client should see the total before the inspection, not after.
- Payment timing — due at time of inspection, due upon report delivery, or invoiced with net terms (typical for commercial clients and relocation companies). Most residential inspectors collect payment on-site before beginning the inspection or during the inspection. Commercial clients and relocation companies typically require net-30 invoicing.
- Accepted payment methods — cash, check, credit card, Venmo, Zelle, ACH, or invoiced. If you accept credit cards on-site, note whether you use a mobile card reader or send an invoice link. If you require payment before the report is delivered, state that policy clearly.
- Cancellation and rescheduling policy — what happens if the client cancels the day before the inspection? What if the buyer's agent cancels two hours before you are scheduled to arrive because the deal fell through? Most inspectors require 24-hour notice for cancellations without a fee and charge a cancellation fee (typically $50 to $150) for late cancellations. Your intake should document this policy and require the client's acknowledgment. In a market where deals fall through frequently, late cancellations can cost an inspector hundreds of dollars per week in lost revenue and wasted travel time.
- Re-inspection fees — if the buyer requests a re-inspection after repairs are completed, what is the fee? Re-inspections are typically shorter than full inspections (focused on the specific repairs that were requested) and priced at a reduced rate. Your intake should document the re-inspection fee and what it includes.
Turning intake into a competitive advantage
A comprehensive intake process does three things for a home inspection business. First, it eliminates surprises on-site — you know the property, the systems, the scope, and the client's expectations before you arrive. Second, it protects you legally — your pre-inspection agreement, your scope documentation, and your exclusions are established in writing before the inspection begins. Third, it signals professionalism — clients who receive a thorough intake form before their inspection understand that they are hiring an inspector who takes documentation seriously, which is exactly the quality they want in the person evaluating the largest purchase of their life.
Most inspection businesses grow through real estate agent referrals. Agents refer inspectors they trust, and trust is built on consistency, professionalism, and thorough documentation. An inspector who shows up with a clipboard, a flashlight, and no pre-inspection paperwork is a liability risk for the agent and the transaction. An inspector who sends a professional intake package in advance, arrives prepared, and delivers a comprehensive report on time is the inspector who gets the next referral.
The difference between those two inspectors is not skill or experience. It is documentation. And documentation starts at intake.
Professional intake forms for home inspection services
Fillable PDF intake form + client questionnaire. Property identification, scope of inspection, pre-inspection agreement, ancillary service add-ons, environmental testing consent, report delivery, and payment terms. Built for home inspectors.
Not ready to buy? Download our free Universal Intake Form — a fillable PDF you can use today, no purchase needed.